FAQs
More FAQs- Do I need to do anything prior to the technician arriving for my scheduled service?
- Is drying and curing the same thing?
- How long will it take to have my hard floors coated with urethane?
Yes, we ask that you remove breakables from the tops of furniture in the breakroom, lobby, conference room and other areas we will be cleaning. Pick up moveable items from the floor such as rugs, plants, trash containers, recycle bins, file cabinets, chairs, etc. Vacuum or dust mop all debris found on your floors prior to your cleaning. If items are too large to move, consult with your technician.
No. Drying means that the surface layer is no longer wet or damp to the touch. Curing, on the other hand, means that acrylic has reached its maximum hardness thereby providing the necessary protection of your flooring.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.